Mortar went off way too fast in the heat and my corner bricks slid
I was laying a garden wall out in Gilbert two Saturdays ago and the temp hit 108 by noon. Mixed my usual 3 to 1 and within maybe 15 minutes the mortar started setting up in the trough, so I was basically fighting it. Got to the corner and two bricks slid about a quarter inch out of plumb before I could tap them back, and I had to pull three of them and clean them up with a chisel. Ended up mixing half batches after that and keeping the tub in the shade, which helped a lot. What are you folks doing for hot weather mixes, more lime, ice water, or just smaller batches all day?
Lime and ice water won't save you once it's 108 out, the heat pulls the water out of the mix before the lime can even do its job. Smaller batches plus a wet burlap over the trough is the real fix, sounds like you already found that out.