My outrigger pad sank in soft dirt at a site in Albany and cost me a full day
Last Thursday I set up on what looked like packed gravel near a drainage ditch and by the second pick the left rear pad was down about 8 inches. I had to shut down, call the GC, and we went back and forth on who was responsible for the ground condition before anyone would let me crib it up. The fix itself took maybe 40 minutes with timber mats, but the waiting and the paperwork ate the entire shift. I've been running a 55 ton for 6 years and I still eyeball soft ground like it's fine when it isn't. How do you all spot bad ground before the pads go down, or do you just always crib?