Update: chased a 6 inch birdbath's worth of water weeping through a cold joint in Topeka for 11 days
Pouring a 30 by 40 shop slab outside Topeka back in March, and two days after the pour I spotted a wet patch about the size of a dinner plate near the control joint. I figured it was just bleed water sweating out, so I let it sit. It didn't dry. I sealed the joint with polyurea, it came back 3 feet over. Pulled the sealer, ground the joint open, and it was still damp 6 inches deep. Turned out the subbase had a low spot that held water and it was wicking straight up through a cold joint where we'd stopped the day before. Took 11 days of drying, grinding, and a urethane injection before that spot finally went quiet. We had to core a couple test holes to even figure out where the moisture was coming from. How do you all handle cold joints on a slab that size, do you stop at a keyway or just keep going?