Rant: my worst concrete day was a 90 degree pour in Phoenix that went bad by 10am
We had 40 yards going down on a driveway off Camelback, and the batch plant sent us mix that started going off in the chute. My screed guy was pulling mud that was already stiff, and we had three guys on floats that looked like they were rowing a boat. By 10am the surface was tearing and we were chasing it with a mag. Boss told me to just keep going and we'd figure out the finish later. We didn't. Came back the next morning and half of it was spider cracked and dull, and the homeowner was standing on his porch with his arms crossed. Cost us two days of grinding and a whole lot of pride. What do you all do when the mix shows up hot and you can't send it back? Do you eat the cost or dump it and start over?