Power trowel vs hand float on a 30x40 garage slab in Boise, and I am not going back
Did a 30x40 garage slab in Boise last month and the homeowner wanted it hand floated because his dad always did it that way. We burned 6 extra hours on that floor and still chased a few low spots with a hand float at the end. Two weeks later we poured a similar slab with a walk behind power trowel and knocked it out in half the time with a way tighter finish. The trowel keeps the surface flat and closes it up even, while the hand float left me fighting the mud the whole way. I get that some guys swear by the hand work on small jobs, but on anything over 400 square feet the machine wins by a mile. What size slab do you all switch over to the trowel on, or do some of you still hand float everything?