Watch your back line if you hire temps through a holiday weekend
Two Saturdays ago at our spot in Portland, a guy sent by an agency during the rush left a sheet pan on the pass for 40 minutes because nobody told him the clock rules. We caught it before it hit a plate, but a health inspector walked in an hour later and I lost a day digging through our logs to show the pan never touched food. If your regular crew is off and you're covering with people you just met, who's the one actually checking their work before service starts?
Used to figure the agency handles their own people, so the blame lands on them if something goes wrong. Not true at all. Inspector does not care who sent the guy, the pan was on your pass and that is your problem. The logs thing is the part that stings, because a 40 minute pan turned into a whole lost day for you. Now I would have one of your own people walk the temps through the clock rules before the rush, even a two minute talk. Someone on your crew owns the check, not the agency. The money you save on temps disappears the second you lose a day to paper.