Built a 10x12 shed foundation in my Port Orchard backyard and it took 3 tries to get it level
This past Saturday was the worst build day I've had in a while. I graded the gravel pad, laid the 4x4 skids, and the corner was still 2 inches off, so I had to pull it all up twice before I got smart and used a string line. The mix of wet clay soil and my impatience turned a 4 hour job into 9 hours, and my wife was not happy about dinner at 9pm. Anyone else in the PNW fight with clay soil on a foundation, or is it just me?
Did you ever try digging out the clay and replacing it with a few inches of crushed rock first? I used to figure you could just toss gravel on top of whatever dirt was there and call it done, but that clay holds water and heaves all winter so the pad never stays put. Once I dug down and put in a real base layer with the rock packed tight, my skids stayed level through the whole wet season. It is way more work up front but it beats pulling everything apart twice like you had to. Wet clay is no joke around here, so you are for sure not the only one fighting it.