Update: the 2am drive home after the Dillon panel job taught me to label the can first
Last month I wrapped a panel swap in Dillon around 11pm and drove home with a half dozen loose zone wires rattling in my pocket. Cost me 40 minutes the next morning sorting them by hand because I never marked which came off the keypad side. Now I tag every lead with masking tape and a Sharpie before I cut it loose, even on a simple 6-zone can. Anyone got a faster way to keep track when you are working tired?