Pro tip: the old tech who called my panel work 'a rat's nest' was right, and it stung
Six years back a veteran installer walked my finished job in Cleveland and pointed at my panel and said 'kid, this looks like a rat's nest built by a rat who was in a hurry.' I was mad for two days, then I opened the can and saw he was right: wires crossing every which way, no labels, zip ties half done. These days I give every homerun its own path down the side, label both ends with a Sharpie before I land them, and leave 8 inches of slack coiled neat. It adds about 25 minutes per panel, and I have not had one callback about a mystery wire since. The old guys are not always nice about it, but they usually are not wrong. What is the one piece of criticism that made you change how you dress a panel?